Rincon West Storage Yard
New 16 acre laydown yard including drainage improvements, underground utility relocation, and full depth re-construction of existing roadway.
Airline Road
Complete reconstruction of roadway from S.P.I.D. to McArdle Road with new continuously reinforced concrete pavement and new sub-surface storm water and water infrastructure.
Plains All American CC Dock & Site Prep
Heavy civil construction for new storage tank terminal including mass earthwork, drainage improvements, berms, tank pads, and tank ring foundations.
American Bank Center Loading Dock Expansion
Expansion of existing arena loading docks to add 2 additional loading bays including heavy duty concrete pavement, new 12” limestone screen wall and footing, relocated utilities, and site parking improvements.
City of Corpus Christi Residential Street Rebuild Program
Residential street pavement reconstruction and rehabilitation for various locations including new sidewalks, curb & gutter, curb ramps, driveways, lime/cement stabilization, and HMAC pavement.
La Palmera Parking Lot Rehab
Pavement surface milling, overlays, concrete pavement drives, and parking area striping/signage.
Nueces County Road Rehabilitation Projects
Roadway milling, excavation, geo-grid, limestone base, and HMAC pavement for County Roads 73, 67, 48 & 69.
Buckeye South Texas Gateway Mooring & Breasting Structures
New cast in place mooring & breasting structural concrete including rod-busting, elevated formwork, and place and finish.
Holt Cat Phase 1 Equipment Yard
New heavy duty concrete equipment laydown yard with new drainage ditches and outfall structure.