PROJECTS

Rincon West Storage Yard

New 16 acre laydown yard including drainage improvements, underground utility relocation, and full depth re-construction of existing roadway.

Image

Airline Road

Complete reconstruction of roadway from S.P.I.D. to McArdle Road with new continuously reinforced concrete pavement and new sub-surface storm water and water infrastructure.

airline project

Plains All American CC Dock & Site Prep

Heavy civil construction for new storage tank terminal including mass earthwork, drainage improvements, berms, tank pads, and tank ring foundations.

Image

American Bank Center Loading Dock Expansion

Expansion of existing arena loading docks to add 2 additional loading bays including heavy duty concrete pavement, new 12” limestone screen wall and footing, relocated utilities, and site parking improvements.

Image

City of Corpus Christi Residential Street Rebuild Program

Residential street pavement reconstruction and rehabilitation for various locations including new sidewalks, curb & gutter, curb ramps, driveways, lime/cement stabilization, and HMAC pavement.

city of corpus christi je construction project

La Palmera Parking Lot Rehab

Pavement surface milling, overlays, concrete pavement drives, and parking area striping/signage.

Image

Nueces County Road Rehabilitation Projects

Roadway milling, excavation, geo-grid, limestone base, and HMAC pavement for County Roads 73, 67, 48 & 69.

nueces county roads je construction project

Buckeye South Texas Gateway Mooring & Breasting Structures

New cast in place mooring & breasting structural concrete including rod-busting, elevated formwork, and place and finish.

buckeye project je construction

Holt Cat Phase 1 Equipment Yard

New heavy duty concrete equipment laydown yard with new drainage ditches and outfall structure.

Image